EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
rtardiff
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (515)
Research
- (32)
Workshop
- (39)
Empennage
- (3)
Fuselage
- (25)
Firewall
- (2)
Tail Feathers
- (14)
Wings
- (99)
Controls
- (36)
Avionics
Lighting
Instrument Panel
- (2)
Landing Gear
- (9)
Engine
- (8)
Propeller
- (8)
Fuel System
- (29)
Interior Finish
- (22)
-
Details
-
Panels, again
-
We're covered
-
Have a Seat!
-
Details
-
Trim
-
Right side fabric
-
Right rear panel,...
-
Interior fabric.
-
Interior Fabric
-
More interior fabric
-
Dry-fit fabric
-
Nut plates and...
-
Side panels
-
Side panels
-
Side panels
-
Side panels
-
Design Changes Have...
-
Protecting Controls.2
-
Protecting the Controls
-
Side Panel
-
Pre-Cover preparation.2
Paint / Decals
- (33)
Inspection
- (6)
Tools
- (5)
Bootcowl
- (30)
R&R
- (4)
Covering
- (46)
Brakes
- (3)
Windows
- (11)
Instruments
- (3)
Paint Booth
- (9)
Paint Prep.
- (21)
Cowling
- (16)
Builder Name:
Richard Tardiff
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
2319.25
Total Flight Time:
0.7
Total Expense:
$39.00
Start/Last Date:
Aug 10, 2019 - No Finish Date
Engine:
Lycoming 0360
Friendly URL:
https://eaabuilderslog.org?s=rtardiff
Home or Last Project Picture
May 03, 2022
Side panels
- (8 hours)
Category: Interior Finish
Panels will be anchored to 3/4' aluminum angle. Sheet metal skills are improving, but very slowly. The new 36" brake is most helpful, though the sharp edges cry out for some file work.
36 inch brake.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.